项目数据 我的列表窗口 成本核算 最喜欢的项目
Modified Coelacanth-class Bridge
Modified Coelacanth-class Bridge
patch5.0
1335 164去处
lodestone
Comprising the top of a coelacanth-class submersible, this bridge has been altered to provide even more storage space and equipped with myriad amenities for longer voyages. |
Coelacanth-class Bridge Frame×1成本核算: 0 腮
超硬加隆德钢×9 [伪:60★2]成本核算: 0 腮
步骤:1步骤:1 总 0 腮

Cryptomeria Lumber×9 [木:70★]成本核算: 0 腮
Cryptomeria Log×3
树汁块×9
风之水晶×6
冰之水晶×6
铁刀木木材×9 [木:56]成本核算: 0 腮
光银锭×18 [伪:60★3]成本核算: 0 腮
灵银铆钉×18 [伪:51]成本核算: 47736 腮
步骤:2步骤:2 总 47736 腮

Pure Titanium Plate×9 [伪:70★]成本核算: 0 腮
Pure Titanium Ore×3
焦炭×9
火之水晶×6
土之水晶×6
Molybdenum Ingot×30 [伪:68]成本核算: 104040 腮
Molybdenum Ore×4 [钻探:70]
钴铁矿×1 [钻探:50]
火之水晶×5
灵银铆钉×18 [伪:51]成本核算: 47736 腮
Triphane×6 [雕刻:61]成本核算: 30744 腮
Raw Triphane×3 [钻探:60]
硅岩×1 [钻探:65]
风之水晶×3
Rhodonite×6 [雕刻:70]成本核算: 35280 腮
Raw Rhodonite×3 [钻探:70]
硅岩×1 [钻探:65]
风之水晶×6
硬银附魔墨水×18 [铁艺:54]成本核算: 61236 腮
步骤:3步骤:3 总 279036 腮

Modified Coelacanth-class Bridge 累计
完整的项目名称 | 号码 | 总 | 单项 | 信息 | 分类 | |
---|---|---|---|---|---|---|
![]() | × 36 | 计算 53,424 腮 | 计算 53,424 腮 | ![]() ![]() ![]() | Metal | |
![]() | × 30 | 计算 43,800 腮 | 计算 43,800 腮 | ![]() ![]() ![]() | Metal | |
![]() | × 18 | 计算 17,928 腮 | 计算 17,928 腮 | ![]() ![]() ![]() | Reagent | |
![]() | × 18 | 计算 360,000 腮 | 计算 360,000 腮 | ![]() | Metal | |
![]() | × 9 | 计算 34,605 腮 | 计算 34,605 腮 | ![]() | Metal | |
![]() | × 9 | 计算 89,280 腮 | 计算 89,280 腮 | ![]() | Lumber | |
![]() | × 9 | 未计算 | ![]() | Lumber | ||
![]() | × 9 | 未计算 | ![]() | Metal | ||
![]() | × 6 | 计算 16,500 腮 | 计算 16,500 腮 | ![]() ![]() | Stone | |
![]() | × 6 | 计算 6,540 腮 | 计算 6,540 腮 | ![]() ![]() | Stone | |
![]() | × 1 | 未计算 | Part |