项目数据 我的列表窗口 成本核算 最喜欢的项目
Modified Coelacanth-class Bridge Modified Coelacanth-class Bridge patch5.0 1335 238去处 lodestone
Comprising the top of a coelacanth-class submersible, this bridge has been altered to provide even more storage space and equipped with myriad amenities for longer voyages. |
- Coelacanth-class Bridge Frame×1成本核算: 0 腮
- 超硬加隆德钢×9 [伪:60★2]成本核算: 0 腮
步骤:1步骤:1 总 0 腮
Modified Coelacanth-class Bridge×1
- Cryptomeria Lumber×9 [木:70★]成本核算: 0 腮
- Cryptomeria Log×3
- 树汁块×9
- 风之水晶×6
- 冰之水晶×6
- 铁刀木木材×9 [木:56]成本核算: 0 腮
- 光银锭×18 [伪:60★3]成本核算: 0 腮
- 灵银铆钉×18 [伪:51]成本核算: 47736 腮
步骤:2步骤:2 总 47736 腮
Modified Coelacanth-class Bridge×1
- Pure Titanium Plate×9 [伪:70★]成本核算: 0 腮
- Pure Titanium Ore×3
- 焦炭×9
- 火之水晶×6
- 土之水晶×6
- Molybdenum Ingot×30 [伪:68]成本核算: 104040 腮
- Molybdenum Ore×4 [钻探:70]
- 钴铁矿×1 [钻探:50]
- 火之水晶×5
- 灵银铆钉×18 [伪:51]成本核算: 47736 腮
- Triphane×6 [雕刻:61]成本核算: 30744 腮
- Raw Triphane×3 [钻探:60]
- 硅岩×1 [钻探:65]
- 风之水晶×3
- Rhodonite×6 [雕刻:70]成本核算: 35280 腮
- Raw Rhodonite×3 [钻探:70]
- 硅岩×1 [钻探:65]
- 风之水晶×6
- 硬银附魔墨水×18 [铁艺:54]成本核算: 61236 腮
步骤:3步骤:3 总 279036 腮
Modified Coelacanth-class Bridge×1
Modified Coelacanth-class Bridge 累计
完整的项目名称 | 号码 | 总 | 单项 | 信息 | 分类 | |
---|---|---|---|---|---|---|
灵银铆钉 | × 36 | 计算 53,424 腮 | 计算 53,424 腮 | 51 | Metal | |
Molybdenum Ingot | × 30 | 计算 43,800 腮 | 计算 43,800 腮 | 68 | Metal | |
硬银附魔墨水 | × 18 | 计算 17,928 腮 | 计算 17,928 腮 | 54 | Reagent | |
光银锭 | × 18 | 计算 360,000 腮 | 计算 360,000 腮 | 60★3 | Metal | |
超硬加隆德钢 | × 9 | 计算 34,605 腮 | 计算 34,605 腮 | 60★2 | Metal | |
铁刀木木材 | × 9 | 计算 89,280 腮 | 计算 89,280 腮 | 56 | Lumber | |
Cryptomeria Lumber | × 9 | 未计算 | 70★ | Lumber | ||
Pure Titanium Plate | × 9 | 未计算 | 70★ | Metal | ||
Rhodonite | × 6 | 计算 16,500 腮 | 计算 16,500 腮 | 70 | Stone | |
Triphane | × 6 | 计算 6,540 腮 | 计算 6,540 腮 | 61 | Stone | |
Coelacanth-class Bridge Frame | × 1 | 未计算 | Part |