项目数据 我的列表窗口 成本核算 最喜欢的项目
Shark-class Bridge
Shark-class Bridge
patch4.2
1335 783去处
lodestone
Comprising the top of a shark-class submersible, the bridge houses all of the equipment necessary for the vessel's crew to navigate the unplumbed depths of the Ruby Sea and beyond.
Shark-class Bridge 累计
完整的项目名称 | 号码 | 总 | 单项 | 信息 | 分类 | |
---|---|---|---|---|---|---|
![]() | × 42 | 计算 19,992 腮 | 计算 19,992 腮 | ![]() ![]() | Metal | |
![]() | × 24 | 计算 240,000 腮 | 计算 240,000 腮 | ![]() | Metal | |
![]() | × 21 | 计算 2,058 腮 | 计算 2,058 腮 | ![]() | Metal | |
![]() | × 21 | 计算 1,533 腮 | 计算 1,533 腮 | ![]() ![]() ![]() | Metal | |
![]() | × 21 | 计算 16,317 腮 | 计算 16,317 腮 | ![]() ![]() ![]() | Metal | |
![]() | × 21 | 计算 10,500 腮 | 计算 10,500 腮 | ![]() | Metal | |
![]() | × 21 | 计算 24,297 腮 | 计算 24,297 腮 | ![]() | Metal | |
![]() | × 21 | 计算 13,083 腮 | 计算 13,083 腮 | ![]() | Metal | |
![]() | × 18 | 计算 9,000 腮 | 计算 9,000 腮 | ![]() ![]() | Metal | |
![]() | × 12 | 计算 96,000 腮 | 计算 96,000 腮 | ![]() | Lumber |